Footbridge over Svitava near Tésnohlídkova údolí

On the side of the railway bridge of line No. 260 heading from Blansko to Brno, a suspended metal footbridge is being built over the river Svitava. Its total length will be 49 meters, and the width will be 1,5 meters. It will be connected to the existing roads along the river by an access ramp on each bank. It is being built by the association of companies Simost and Super Krete Czech. The supporting structure consists of a system of brackets and longitudinal beams made of steel…
Share this place with friends

Other places in the vicinity - Footbridge over Svitava near Tésnohlídkova údolí

General view of the staircase

Bílovice nad Svitavou - metal stairs over the rock behind the playground

Quarry in detail

Maloměřice quarry

Hades transmitter

Hády nad Brno transmitter

The bridge over the river Svitava near Sokolovna

Bílovice nad Svitavou - bridge near Sokolovna

Makovský footbridge

Brno-Obrany - Makovského footbridge

Obránsky double-track tunnel

Defense tunnel

Tourist crossroads Tésnohlídkovo údolí (footbridge) - February 2016

Tourist crossroads Tésnohlídkovo údolí (footbridge)

Tésnohlídkovo údolí signpost

Tésnohlídkovo údolí signpost

Svitava between Babice and Bílovice 1

Svitava Valley

Defences: The ruins that remain today from the castle palace.

Defended

That's how it was in the field

Behind the oldest settlement in Brno